Top Menu

_DG89661
_DG89661
_DG89661
_DG89661

St Barnabas and St Pauls Primary

_DG89306

_DG89315_DG89547Traditional construction this 2 storey extension required 80 CFA piles with substanial ground fill prior to sub and super structure work commenced.

The building structure consisted of steel frame, block infill and K Render to several elevations with the main entrance cladded in multi cloured Rock panel.
The scheme consisted of new class room block and toilet facilites together with the refurbishment of existing entrance and administration area.

Client: St Barnabas and St Pauls Primary School
Value: £715,000.00
Location: Blackburn

footer-logos

© 2013 Pinington. All Rights Reserved.